index

Vesgantti 10 Inch Multilayer Hybrid California King Mattress - Multiple Sizes & Styles Available Ergonomic Design with Memory Foam and Pocket Spring Medium Firm Feel White

  • Regular price $385.24

Hurrify, 5 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB08BY9D4XV

Available : Instock

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 1–3 business days
  • Estimated Delivery: 3–5 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti 10 Inch Multilayer Hybrid California King Mattress - Multiple Sizes & Styles Available Ergonomic Design with Memory Foam and Pocket Spring Medium Firm Feel White

$385.24

Frequently Asked Questions

  • Q: What are the dimensions of the Vesgantti California King Mattress? A: The Vesgantti California King Mattress measures eighty-four point zero two inches in length, seventy-two point zero one inches in width, and ten inches in height.
  • Q: Is the mattress made with safe materials? A: Yes, the mattress is CertiPUR-US certified, ensuring that it is made without harmful chemicals and meets safety standards.
  • Q: What type of materials are used in the mattress construction? A: The mattress features a hybrid construction of memory foam and pocketed innerspring, providing both comfort and support.
  • Q: How do I set up the Vesgantti mattress? A: Simply unbox the mattress, lay it flat, and allow it to expand for forty-eight to seventy-two hours before use.
  • Q: Is this mattress suitable for all sleeping positions? A: Yes, the medium firm feel of the mattress accommodates various sleeping positions, making it suitable for most sleepers.
  • Q: Can I use this mattress on an adjustable bed frame? A: Yes, the Vesgantti California King Mattress is compatible with adjustable bed frames, providing versatility in your sleeping arrangements.
  • Q: How should I clean the Vesgantti mattress? A: To clean the mattress, use a damp cloth with mild detergent and avoid soaking it. Spot cleaning is recommended.
  • Q: Is the mattress resistant to allergens? A: Yes, the materials used in the Vesgantti mattress are designed to be hypoallergenic, reducing the risk of allergens.
  • Q: What is the weight limit for this mattress? A: The mattress can support a weight limit of approximately five hundred pounds, accommodating couples or individuals comfortably.
  • Q: How does the motion isolation feature work? A: The independent working of the innerspring coils minimizes motion transfer, allowing partners to move without disturbing each other.
  • Q: Is there a warranty on the Vesgantti mattress? A: Yes, the Vesgantti mattress typically comes with a warranty that covers defects in materials and workmanship.
  • Q: What if my mattress arrives damaged? A: If your mattress arrives damaged, you should contact customer service immediately for assistance with returns or exchanges.
  • Q: How long will the mattress last? A: With proper care, the Vesgantti mattress is designed to last at least seven to ten years, providing long-term comfort.
  • Q: Can this mattress help with back pain? A: Yes, the balanced support of the hybrid design can help alleviate back pain by promoting proper spinal alignment during sleep.
  • Q: Is the mattress delivered in a box? A: Yes, the Vesgantti mattress is compressed and rolled up in a box for convenient shipping and delivery.