index

Vesgantti Full Size Mattress, 10 Inch Hybrid Full Mattress In A Box, Double Mattress With Memory Foam And Pocket Spring, Ergonom

  • Regular price $253.78

Hurrify, 5 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB07D538WH2

Available : Instock

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 1–3 business days
  • Estimated Delivery: 3–5 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti Full Size Mattress, 10 Inch Hybrid Full Mattress In A Box, Double Mattress With Memory Foam And Pocket Spring, Ergonom

$253.78

Frequently Asked Questions

  • Q: What are the dimensions of the Vesgantti Full Size Mattress? A: The Vesgantti Full Size Mattress measures fifty-four inches in width, seventy-five inches in length, and ten inches in height.
  • Q: What materials are used in the Vesgantti mattress? A: The mattress is made of pocket springs and multiple layers of foam, including luxury knit fabrics, polypropylene cotton, and high-density support foam.
  • Q: Is the Vesgantti mattress safe and fire-resistant? A: Yes, the mattress is made with luxury thick knit fabrics that are soft, breathable, and anti-fire compliant with US standards.
  • Q: How do I set up the Vesgantti mattress? A: Unbox the mattress carefully, as it is vacuum sealed and rolled. After unpacking, allow it to expand for about ten seconds before use.
  • Q: Is this mattress suitable for all sleeping positions? A: Yes, the Vesgantti mattress provides ergonomic support designed to cater to various sleeping positions, including back, side, and stomach sleepers.
  • Q: Can I use a mattress protector on the Vesgantti mattress? A: Yes, it is recommended to use a mattress protector or cover to maintain hygiene and protect the mattress.
  • Q: How should I maintain my Vesgantti mattress? A: To maintain the mattress, rotate it regularly to keep the springs and foam in good condition, and ensure good ventilation.
  • Q: Is the Vesgantti mattress easy to clean? A: Yes, you can clean the surface with a damp cloth, but avoid using harsh chemicals that may damage the materials.
  • Q: How long will the Vesgantti mattress last? A: With proper care, the Vesgantti mattress is designed to last several years, depending on usage and maintenance.
  • Q: Is there a warranty for the Vesgantti mattress? A: Yes, the Vesgantti mattress typically comes with a warranty, but please check the specific terms at the time of purchase.
  • Q: Can you return the Vesgantti mattress if I’m not satisfied? A: Yes, there is a return policy in place for the Vesgantti mattress; however, terms may vary, so it is important to check the details.
  • Q: What if the mattress arrives damaged? A: If the mattress arrives damaged, contact customer support immediately for assistance with a replacement or refund.
  • Q: Does the Vesgantti mattress make noise when moving? A: No, the mattress is designed with high-quality individual pocket springs and foam to effectively absorb noise and vibrations.
  • Q: Is the Vesgantti mattress suitable for heavier individuals? A: Yes, the multilayer foam and pocket spring system provides excellent support and pressure relief for individuals of varying weights.
  • Q: How does the mattress feel in terms of firmness? A: The Vesgantti mattress has a medium firm feel, providing a balance of support and comfort for a restful sleep.
  • Q: Will the mattress cause overheating while sleeping? A: No, the mattress features breathable materials designed to expel heat and moisture, keeping you comfortable and dry during sleep.