index

Vesgantti Queen Mattress, 10 Inch Innerspring Multilayer Hybrid Queen Size Mattress, Ergonomic Design With Breathable Foam And P

  • Regular price $257.04

Hurrify, 5 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB07PVV8JJ5

Available : Instock

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 1–3 business days
  • Estimated Delivery: 3–5 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
  • Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti Queen Mattress, 10 Inch Innerspring Multilayer Hybrid Queen Size Mattress, Ergonomic Design With Breathable Foam And P

$257.04

Frequently Asked Questions

  • Q: What materials is the Vesgantti Queen Size Mattress made of? A: The Vesgantti Queen Size Mattress is made of foam and pocket springs. This combination offers comfort and support through its multi-layer construction.
  • Q: What are the dimensions of this mattress? A: The mattress measures approximately seventy-five inches long, sixty inches wide, and ten inches high. This size is ideal for a standard queen bed.
  • Q: How does the mattress support the body? A: The mattress features an innovative zoned support system with hundreds of individual pocketed stainless spring coils. Each spring works independently to provide even support across seven parts of your body.
  • Q: How do I set up the Vesgantti mattress? A: To set up the mattress, carefully remove it from the vacuum-sealed packaging. Allow it to expand fully for forty-eight hours before use.
  • Q: Is this mattress suitable for people with back pain? A: Yes, this mattress is designed to relieve back and neck pain. Its medium-firm feel supports proper spinal alignment during sleep.
  • Q: Can I use this mattress on any bed frame? A: Yes, the mattress is compatible with most bed frames. Ensure the frame provides adequate support for a queen-size mattress.
  • Q: How do I clean the Vesgantti mattress? A: To clean the mattress, spot clean any stains with a mild detergent and water. Avoid soaking the mattress or using harsh chemicals.
  • Q: What should I do if the mattress arrives damaged? A: If the mattress arrives damaged, contact the seller immediately for return instructions. Most sellers have a return policy for damaged goods.
  • Q: Is this mattress safe for children? A: Yes, the Vesgantti mattress is made from non-toxic materials, making it safe for children. However, always supervise young children while they are on the bed.
  • Q: How does the mattress handle motion transfer? A: The mattress effectively absorbs motion due to its pocket spring design. This minimizes disturbances from tossing and turning during the night.
  • Q: What is the warranty on the Vesgantti mattress? A: The Vesgantti mattress typically comes with a warranty that covers defects in materials and workmanship. Check the specific warranty details from the seller.
  • Q: Does this mattress have a smell when first unpacked? A: Yes, it may have a slight odor upon opening due to the packaging. This should dissipate within a few days as it airs out.
  • Q: Is the Vesgantti mattress suitable for side sleepers? A: Yes, side sleepers can benefit from the mattress's medium-firm feel and zoned support, providing comfort for hips and shoulders.
  • Q: How does the mattress maintain breathability? A: The mattress is designed with multi-layer foams that promote airflow. This helps dissipate sweat and moisture, keeping you comfortable during sleep.
  • Q: Can I roll the mattress back up after use? A: No, once the mattress is opened and restored, it cannot be rolled back up. It is vacuum sealed for shipping and needs to remain expanded.