 
      Vesgantti Twin Xl Mattress, 10 Inch Hybrid Xl Twin Mattress In A Box, Extra Long Pillow Top Twin Matrress, Gel Memory Foam And P
        $308.32
      
      
      
    Frequently Asked Questions
- Q: What is the size of the Vesgantti Twin XL Mattress? A: The Vesgantti Twin XL Mattress measures approximately 80 inches long, 39 inches wide, and 10 inches high.
- Q: What type of support does this mattress provide? A: This mattress features a medium-firm plush feel, supported by a luxury multilayer foam and individual pocket spring system that helps alleviate back and neck pain.
- Q: How does the individual pocket spring system work? A: The individual pocket spring system consists of hundreds of stainless steel coils that work independently to provide even support across seven areas of your body, enhancing comfort and spinal alignment.
- Q: Is the mattress breathable? A: Yes, the mattress is designed with multi-layer foams that promote good air circulation, helping to dissipate sweat and moisture for a comfortable sleep environment.
- Q: Is the mattress quiet during use? A: The design of the mattress, which combines pocket springs and multilayer foams, effectively absorbs noise and vibrations, reducing disturbances from movement.
- Q: How is the mattress packaged for delivery? A: The mattress is vacuum sealed and rolled in a box for convenient delivery, making it easier to carry and unpack.
- Q: How long does it take for the mattress to fully expand? A: After unpacking, the mattress typically fully expands within 72 hours, but it can be restored to its shape in about 10 seconds once unrolled.
- Q: Can the mattress be rolled back after unboxing? A: No, once the mattress is unpacked and restored, it cannot be rolled back into its original packaging.
- Q: What should I do if I experience discomfort while using the mattress? A: If you experience discomfort, it may be beneficial to give your body time to adjust to the new mattress. If issues persist, consider consulting with a healthcare professional.
- Q: Is this mattress suitable for all sleeping positions? A: Yes, the medium-firm support and zoned design of the mattress make it suitable for various sleeping positions, accommodating back, side, and stomach sleepers.
 
