index

Vesgantti 10 Inch Multilayer Hybrid Cal King Mattress - Multiple Sizes & Styles Available Ergonomic Design with Memory Foam and Pocket Spring Medium Firm Feel Grey

  • Regular price $310.11

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB0BN1G28R1

Available : Sold Out

Answer

Shipping & Delivery Policy

At Homenkitchenshop, we ensure that all orders are securely packaged and shipped with full insurance for added peace of mind. Our standard processing time is within 1-3 business days, and all items are shipped from our facility in the United States using reliable, secure shipping methods. To verify your order and payment, we may reach out to you for additional information if necessary.

Your order will be delivered directly to your doorstep, carefully packed to prevent any damage during transit. 

Note: Orders over $250 will require a signature upon delivery.

Shipping Destinations

We currently ship within the United States.

Processing Time

Orders are processed in 1-3 business days.

Shipping Methods & Delivery Times

  • U.S: 3-5 business days

Shipping Costs

We offer free shipping within the U.S.

Order Tracking

Once your order has shipped, you will receive an email with a tracking number to follow the progress of your shipment.

Lost or Delayed Shipments

If your package is lost or delayed, please contact our customer service team, and we’ll assist you in resolving the issue promptly.

Returns & Refunds

For details on returns and refunds, please refer to our Return Policy.

If you have any questions or need assistance, our customer service team is here to help! Reach out to us at support@homenkitchenshop.com.

Secure payment

  ⚠️ California Proposition 65 Warning :
   Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.  

For more information, visit     www.P65Warnings.ca.gov.  

Guarantee safe checkout

Vesgantti 10 Inch Multilayer Hybrid Cal King Mattress - Multiple Sizes & Styles Available Ergonomic Design with Memory Foam and Pocket Spring Medium Firm Feel Grey

$310.11

Frequently Asked Questions

  • Q: What materials are used in the Vesgantti 10 Inch Multilayer Hybrid Cal King Mattress? A: The Vesgantti mattress features CertiPUR-US certified memory foam and a 7-zone pocketed innerspring hybrid construction.
  • Q: Is the Vesgantti mattress suitable for all sleeping positions? A: Yes, the mattress is designed to provide adequate support and conform to the body, offering a balanced sleep experience for all types of sleepers.
  • Q: How does the Vesgantti mattress minimize motion transfer? A: The innerspring system works independently, which improves motion isolation and reduces noise, allowing for undisturbed sleep.
  • Q: What is the firmness level of the Vesgantti mattress? A: The Vesgantti mattress offers a medium firm feel, which is designed to meet the sleeping preferences of most people.
  • Q: How should I care for my Vesgantti mattress? A: To care for your mattress, use a mattress protector and regularly rotate it to ensure even wear. Spot clean any spills with a mild detergent.
  • Q: How long does it take for the Vesgantti mattress to fully expand after unboxing? A: It is recommended to wait 48 to 72 hours, or longer, for the mattress to fully expand before using it.
  • Q: Does the Vesgantti mattress come compressed in a box? A: Yes, the Vesgantti mattress is compressed and roll-packed in a box for convenient shipping.
  • Q: What type of cover does the Vesgantti mattress have? A: The mattress is designed with a breathable knitted fabric cover to enhance airflow circulation and dissipate body heat.
  • Q: Is the Vesgantti mattress safe and healthy to use? A: Yes, the mattress is made with breathable materials and CertiPUR-US certified foam, ensuring it is safe and healthy for use.
  • Q: Can the Vesgantti mattress be used on any type of bed frame? A: The Vesgantti mattress is compatible with most bed frames, including platform beds, box springs, and adjustable bases.