index

Vesgantti 12 Inch Multilayer Hybrid Cal King Mattress - Multiple Sizes & Styles Available Ergonomic Design with Memory Foam and Pocket Spring Medium Firm Feel Grey

  • Regular price $436.53
Free Standard Shipping Across USA

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB0B7R6LSY3

Available : Sold Out

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 1-3 business days
  • Estimated Delivery: 4-7 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti 12 Inch Multilayer Hybrid Cal King Mattress - Multiple Sizes & Styles Available Ergonomic Design with Memory Foam and Pocket Spring Medium Firm Feel Grey

$436.53

Frequently Asked Questions

  • Q: What is the construction of the Vesgantti 12 Inch Multilayer Hybrid Cal King Mattress? A: The Vesgantti mattress features a CertiPUR-US certified memory foam and a 7-zone pocketed innerspring hybrid construction, designed to provide balanced support and pressure relief.
  • Q: How does the mattress minimize noise and motion transfer? A: The innerspring coils of the mattress work independently, offering better motion isolation and less noise, while the slow-rebound foam helps absorb sound and vibrations for a quieter sleep experience.
  • Q: What materials are used in the Vesgantti mattress? A: The mattress is designed with a breathable knitted fabric cover and multiple layers of foam, enhancing airflow and dissipating body heat for a cool sleeping environment.
  • Q: What is the firmness level of the Vesgantti mattress? A: The Vesgantti hybrid mattress offers a medium firm feel, making it suitable for most sleeping preferences.
  • Q: How long does it take for the mattress to fully expand after unboxing? A: After unboxing, it is recommended to wait 48 to 72 hours, or longer, for the mattress to fully expand and reach its intended shape.
  • Q: Is the Vesgantti mattress suitable for all sleeping positions? A: Yes, the balanced support and pressure relief provided by the hybrid construction make it suitable for various sleeping positions, including side, back, and stomach sleepers.
  • Q: How is the Vesgantti mattress delivered? A: The mattress is compressed and roll-packed in a box, making it easy to ship directly to your door.
  • Q: Can the Vesgantti mattress be used with any bed frame? A: Yes, the Vesgantti mattress is compatible with most bed frames, including box springs, platform beds, and adjustable bases.
  • Q: What maintenance is required for the Vesgantti mattress? A: Regularly rotating the mattress can help maintain its shape and comfort over time. Additionally, using a mattress protector is recommended to keep it clean.
  • Q: Is the Vesgantti mattress safe for sensitive individuals? A: Yes, the mattress is CertiPUR-US certified, meaning it is made without harmful chemicals and is safe for sensitive individuals.