index

Vesgantti 8 Inch Multilayer Hybrid Queen Mattress - Multiple Sizes & Styles Available Ergonomic Design with Memory Foam and Pocket Spring Medium Firm Feel White

  • Regular price $308.32
Free Standard Shipping Across USA

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB08DFHQCWT

Available : Sold Out

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 3–5 business days
  • Estimated Delivery: 6–10 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti 8 Inch Multilayer Hybrid Queen Mattress - Multiple Sizes & Styles Available Ergonomic Design with Memory Foam and Pocket Spring Medium Firm Feel White

$308.32

Frequently Asked Questions

  • Q: What materials are used in the Vesgantti mattress? A: The Vesgantti mattress is made with CertiPUR-US certified memory foam and a seven-zone pocketed innerspring hybrid construction.
  • Q: What are the dimensions of the queen mattress? A: The queen mattress measures eighty inches in length, sixty inches in width, and eight inches in height.
  • Q: Is the mattress available in different sizes? A: Yes, the Vesgantti mattress is available in multiple sizes and styles to suit various preferences.
  • Q: How do I set up the Vesgantti mattress? A: Unbox the compressed mattress and allow it to fully expand for forty-eight to seventy-two hours before use.
  • Q: What is the firmness level of the Vesgantti mattress? A: The mattress offers a medium firm feel, catering to most people's sleeping preferences.
  • Q: Is the mattress suitable for all sleeping positions? A: Yes, the hybrid design provides adequate support and conforms to the body, making it suitable for all sleepers.
  • Q: How do I clean the Vesgantti mattress? A: Spot clean the mattress with mild detergent and water; avoid using harsh chemicals or soaking it.
  • Q: What should I do if my mattress arrives damaged? A: Contact customer support immediately to report the issue and initiate a return or replacement process.
  • Q: Is the mattress safe for children? A: Yes, the materials used in the Vesgantti mattress are certified and meet safety standards for all ages.
  • Q: How do I store the mattress if I need to move it? A: Roll the mattress back into the original packaging and store it in a cool, dry place away from direct sunlight.
  • Q: What makes this mattress different from traditional mattresses? A: The Vesgantti mattress combines memory foam with pocket springs for enhanced support and motion isolation.
  • Q: Is the Vesgantti mattress breathable? A: Yes, it features a breathable knitted fabric cover that enhances airflow and dissipates body heat.
  • Q: How does the mattress reduce motion transfer? A: The independent working of the innerspring coils minimizes motion transfer, allowing for undisturbed sleep.
  • Q: What is the warranty policy for the Vesgantti mattress? A: The mattress comes with a warranty that covers defects in materials and workmanship; the length varies by retailer.
  • Q: Can I return the mattress if I don't like it? A: Yes, most retailers offer a return policy that allows you to return the mattress within a specified timeframe.