index

Vesgantti California King Mattress 10 Inch Innerspring Multilayer Hybrid Cal King Size Mattress - Ergonomic Design with Memory Foam and Pocket Spring Mattress - Box Top Series Medium Firm Feel

  • Regular price $423.71
Free Standard Shipping Across USA

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB09FYYFFMQ

Available : Sold Out

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 3–5 business days
  • Estimated Delivery: 6–10 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti California King Mattress 10 Inch Innerspring Multilayer Hybrid Cal King Size Mattress - Ergonomic Design with Memory Foam and Pocket Spring Mattress - Box Top Series Medium Firm Feel

$423.71

Frequently Asked Questions

  • Q: What are the dimensions of the Vesgantti California King Mattress? A: The Vesgantti California King Mattress measures eighty-four point zero two inches long, seventy-two point zero one inches wide, and ten inches high.
  • Q: What materials are used in this mattress? A: The Vesgantti California King Mattress features multilayer foams and a pocket spring support system.
  • Q: What firmness level does this mattress offer? A: This mattress has a medium firm feel, designed to provide balanced support and comfort.
  • Q: How do I set up the Vesgantti California King Mattress? A: To set up the mattress, simply unbox it, remove the protective layers, and allow it to expand in a suitable bedroom environment.
  • Q: Is this mattress suitable for all sleeping positions? A: Yes, the Vesgantti California King Mattress is designed to provide support for all sleepers, regardless of sleeping position.
  • Q: Can I use a mattress protector with this mattress? A: Yes, using a mattress protector is recommended to keep the mattress clean and prolong its lifespan.
  • Q: How do I clean the Vesgantti California King Mattress? A: To clean the mattress, spot clean with a mild detergent and water; avoid using harsh chemicals.
  • Q: Is this mattress safe for children? A: Yes, the Vesgantti California King Mattress is made with non-toxic materials, making it safe for children.
  • Q: What is the warranty on the Vesgantti California King Mattress? A: The mattress comes with a standard warranty that covers defects in materials and workmanship.
  • Q: How do I know if this mattress is right for me? A: If you prefer a medium firm mattress that provides balanced support, the Vesgantti California King Mattress is a suitable choice.
  • Q: What if my mattress arrives damaged? A: If your mattress arrives damaged, contact customer service immediately for assistance with returns or replacements.
  • Q: Can this mattress help with back pain? A: Yes, the ergonomic design of the Vesgantti California King Mattress can help alleviate pressure points and support spinal alignment.
  • Q: What is the shipping process for this mattress? A: The mattress is shipped compressed in a box and will expand to its full size once removed from the packaging.
  • Q: How long does it take for the mattress to fully expand? A: The mattress typically takes twenty-four to forty-eight hours to fully expand after unboxing.
  • Q: Is this mattress compatible with adjustable bed frames? A: Yes, the Vesgantti California King Mattress is compatible with adjustable bed frames, allowing for customizable comfort.
  • Q: What should I do if I experience an odor after unboxing? A: If you notice an odor, it is normal for newly unboxed mattresses; allow it to air out in a well-ventilated room.