index

Vesgantti California King Mattress 12 Inch Innerspring Multilayer Hybrid Cal King Size Mattress - Ergonomic Design With Memory F

  • Regular price $406.07
Free Standard Shipping Across USA

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB0B12L8MQB

Available : Sold Out

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 3–5 business days
  • Estimated Delivery: 6–10 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti California King Mattress 12 Inch Innerspring Multilayer Hybrid Cal King Size Mattress - Ergonomic Design With Memory F

$406.07

Frequently Asked Questions

  • Q: What are the dimensions of the Vesgantti California King Mattress? A: The Vesgantti California King Mattress measures 72 inches wide by 84 inches long, suitable for California King bed frames.
  • Q: What materials are used in the Vesgantti Hybrid Mattress? A: The mattress is constructed with pocket springs, cotton, and memory foam, providing a balance of support and comfort.
  • Q: Is the Vesgantti mattress suitable for all sleep positions? A: Yes, the Vesgantti Hybrid Mattress is designed to offer balanced support, making it suitable for all sleep positions.
  • Q: What is the firmness level of the Vesgantti California King Mattress? A: This mattress features a medium-firm feel, providing a good balance of support and comfort for most sleepers.
  • Q: How does the pocket spring system work in this mattress? A: The pocket spring system allows individual springs to move independently, providing targeted support and reducing motion transfer between sleepers.
  • Q: Can the Vesgantti mattress help with pressure relief? A: Yes, the multilayer foams and pocket springs are designed to relieve pressure on key areas of the body for a more comfortable sleep experience.
  • Q: Is the Vesgantti mattress easy to care for? A: Yes, the mattress is designed to be low maintenance, but regular rotation and using a mattress protector are recommended for longevity.
  • Q: Does the Vesgantti California King Mattress come with a warranty? A: Yes, the Vesgantti mattress typically comes with a warranty, but please check the specific warranty details provided with your purchase.
  • Q: How long does it take for the mattress to fully expand after unboxing? A: The mattress usually takes 24 to 48 hours to fully expand after being unboxed, although some may notice it expanding more quickly.
  • Q: Is the Vesgantti California King Mattress compatible with adjustable bed frames? A: Yes, the Vesgantti mattress is compatible with most adjustable bed frames, providing flexibility for various sleeping positions.