index

Vesgantti Full Mattress 12 Inch Innerspring Hybrid Full Size Mattress with Memory Foam and Individual Pocket Springs Mattress in a Box Medium Firm Feel

  • Regular price $372.42
Free Standard Shipping Across USA

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB08CZNC5M2

Available : Sold Out

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 3–5 business days
  • Estimated Delivery: 6–10 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti Full Mattress 12 Inch Innerspring Hybrid Full Size Mattress with Memory Foam and Individual Pocket Springs Mattress in a Box Medium Firm Feel

$372.42

Frequently Asked Questions

  • Q: What are the dimensions of the Vesgantti Full Mattress? A: The Vesgantti Full Mattress measures 12 inches in thickness and is designed to fit standard full-size bed frames.
  • Q: Is the Vesgantti mattress suitable for all sleeping positions? A: Yes, the mattress features a 7-zone individual pocketed spring system that adapts to your body's curves, providing support for various sleeping positions.
  • Q: How does the lavender cover benefit the mattress? A: The lavender stretch knit cover promotes cooling and helps regulate body temperature, enhancing your overall comfort during sleep.
  • Q: What is the firmness level of the Vesgantti Full Mattress? A: The mattress offers a medium-firm feel, which is suitable for most sleepers, balancing softness and support.
  • Q: Does the mattress minimize motion transfer? A: Yes, the independent pocket springs help minimize motion transfer, allowing for a quieter sleep experience even if your partner moves.
  • Q: How is the Vesgantti mattress packaged? A: The mattress is compressed and roll-packed in a box for easy shipping, expanding to its full size within 72 hours.
  • Q: What materials are used in the Vesgantti Full Mattress? A: The mattress features multilayer foam combined with individual pocket springs, designed for comfort and support.
  • Q: Can the mattress be used on any bed frame? A: Yes, the Vesgantti Full Mattress is compatible with most bed frames, including platform beds and adjustable bases.
  • Q: How do I care for my Vesgantti mattress? A: To maintain your mattress, rotate it every few months and use a mattress protector to keep it clean. Avoid using harsh chemicals.
  • Q: Is there a trial period or warranty for the Vesgantti Full Mattress? A: Yes, Vesgantti typically offers a trial period and a warranty for their mattresses, allowing you to test it for comfort and quality.