index

Vesgantti King Mattress, 12 Inch Hybrid King Size Mattress In A Box, Memory Foam And Individually Pocket Spring, Innerspring Mat

  • Regular price $297.96
Free Standard Shipping Across USA

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB0CJC9WRR9

Available : Sold Out

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 3–5 business days
  • Estimated Delivery: 6–10 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti King Mattress, 12 Inch Hybrid King Size Mattress In A Box, Memory Foam And Individually Pocket Spring, Innerspring Mat

$297.96

Frequently Asked Questions

  • Q: What materials is the Vesgantti King Mattress made of? A: The mattress is made of memory foam and individually wrapped pocket coils. This combination offers targeted support and pressure relief.
  • Q: What are the dimensions of the Vesgantti King Mattress? A: The mattress measures eighty inches in length, seventy-six inches in width, and twelve point one inches in height. It is designed to fit standard king size bed frames.
  • Q: Is the Vesgantti King Mattress hypoallergenic? A: Yes, the mattress is hypoallergenic. It is made from materials that are non-toxic and safe for sensitive individuals.
  • Q: How do I set up the Vesgantti King Mattress? A: Simply unbox the mattress and place it on your bed frame. Be sure to maintain a safe distance while unwrapping as it expands quickly.
  • Q: Can the Vesgantti King Mattress be used on any bed frame? A: Yes, it can be used on various bed frames, including platform beds and adjustable bases. Ensure the frame supports the mattress size.
  • Q: How firm is the Vesgantti King Mattress? A: The mattress is categorized as medium firm. It balances comfort and support, making it suitable for various sleeping positions.
  • Q: What is the best way to clean the Vesgantti King Mattress? A: Spot clean with mild soap and water. Avoid using harsh chemicals, and use a mattress protector to prolong cleanliness.
  • Q: Is the Vesgantti King Mattress safe for children? A: Yes, it is safe for children. The materials used are non-toxic and free from harmful substances, ensuring a healthier sleep environment.
  • Q: How should I store the Vesgantti King Mattress? A: If you need to store the mattress, keep it in a cool, dry place and avoid placing heavy items on top. Store it flat if possible.
  • Q: How does the Vesgantti King Mattress handle motion transfer? A: The mattress features pocket coils that minimize motion transfer. This allows couples to sleep without being disturbed by each other's movements.
  • Q: What type of fabric is used in the Vesgantti King Mattress? A: The mattress is covered with high-quality breathable fabrics. This enhances airflow and helps maintain a comfortable sleeping temperature.
  • Q: Is there a warranty on the Vesgantti King Mattress? A: Yes, the mattress typically comes with a warranty. Check with the manufacturer for specific terms and duration.
  • Q: Can I return the Vesgantti King Mattress if I'm not satisfied? A: Yes, most retailers offer a return policy. Be sure to read the specific terms associated with your purchase.
  • Q: How long does it take for the Vesgantti King Mattress to fully expand? A: It may take up to twenty-four hours for the mattress to fully expand. Allow this time to ensure optimal comfort.
  • Q: Does the Vesgantti King Mattress have any harmful chemicals? A: No, it is CertiPUR-US certified, meaning it is free from harmful chemicals and materials like fiberglass.