index

Vesgantti Queen Mattress, 10 Inch Hybrid Innerspring Mattress With Memory Foam, Support & Pressure Relief, Medium Firm Feel Matt

  • Regular price $176.34
Free Standard Shipping Across USA

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB0C85M7CJ8

Available : Sold Out

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 3–5 business days
  • Estimated Delivery: 6–10 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti Queen Mattress, 10 Inch Hybrid Innerspring Mattress With Memory Foam, Support & Pressure Relief, Medium Firm Feel Matt

$176.34

Frequently Asked Questions

  • Q: What are the dimensions of the Vesgantti Queen Mattress? A: The Vesgantti Queen Mattress measures sixty inches in width, eighty inches in length, and ten inches in height.
  • Q: What materials are used in the Vesgantti Queen Mattress? A: The mattress is made from pocket spring and foam, providing a hybrid design for support and comfort.
  • Q: Is the Vesgantti Queen Mattress eco-friendly? A: Yes, the foam used is CertiPUR-US certified, non-toxic, and hypoallergenic, making it a safe choice for your family.
  • Q: How do I unpack the Vesgantti Queen Mattress? A: To unpack, carefully remove the plastic wrapping while maintaining a safe distance to avoid any recoil from the mattress.
  • Q: How long should I allow the mattress to expand? A: It is recommended to allow seventy-two hours for the mattress to fully expand after unpacking.
  • Q: Is the Vesgantti Queen Mattress suitable for all sleeping positions? A: Yes, its medium firm feel provides balanced support for side, back, and stomach sleepers.
  • Q: Can I use the Vesgantti Queen Mattress on any bed frame? A: Yes, the mattress is compatible with various bed frames, including slatted and box spring styles.
  • Q: How do I maintain the Vesgantti Queen Mattress? A: To maintain it, regularly rotate the mattress and use a protective cover to keep it clean and hygienic.
  • Q: What is the weight limit for the Vesgantti Queen Mattress? A: The mattress can comfortably support up to six hundred pounds, accommodating most couples or individuals.
  • Q: Is the Vesgantti Queen Mattress easy to move? A: Yes, the mattress is vacuum-packed in a box, making it easy to carry and transport.
  • Q: What if the mattress arrives damaged? A: If the mattress arrives damaged, please contact customer support immediately for assistance with returns or exchanges.
  • Q: Does the Vesgantti Queen Mattress have motion isolation? A: Yes, the individually wrapped pocket coils minimize motion transfer, allowing for undisturbed sleep.
  • Q: What if I experience discomfort while sleeping on the mattress? A: If you experience discomfort, consider adjusting your sleeping position or using additional bedding for support.
  • Q: Can I return the Vesgantti Queen Mattress? A: Yes, the mattress typically comes with a return policy; please check the specific terms for details.
  • Q: How should I clean the Vesgantti Queen Mattress? A: To clean, spot clean any stains with mild soap and water; avoid using harsh chemicals or soaking the mattress.