index

Vesgantti Twin Mattress, 10 Inch Innerspring Hybrid Mattress In A Box, Pressure Relief Pocket Spring Twin Size Mattress With Mem

  • Regular price $189.85
Free Standard Shipping Across USA

Hurrify, 0 item(s) left in stock!

Join Waitlist
Wishlist

Brand: Vesgantti

Type: Furniture,Bedroom Furniture,Mattresses & Box Springs

Sku: WBHOMB07NPLQWW5

Available : Sold Out

Sold by HomeNKitchenShop, an authorized reseller.

Returns accepted within 30 days  |  support@homenkitchenshop.com

✓ Verified
Shipping Information
  • Free Standard Shipping — United States only
  • Processing Time: 3–5 business days
  • Estimated Delivery: 6–10 business days after dispatch
  • Carefully packed to keep your home & kitchen items safe during transit
  • Tracking number sent via email once dispatched
Returns & Refund

Returns accepted within 30 days of delivery.

Damaged or Defective Item

Free return shipping + replacement or full refund

Wrong Item Received

Free return shipping + replacement or full refund

Change of Mind

Return shipping at customer's expense · Item must be unused, unwashed & in original packaging

All returns require a Return Authorization (RA) number before sending.

To initiate a return, contact us:

support@homenkitchenshop.com +1 832-730-5801
View Full Return & Refund Policy
Safety & Compliance
⚠️

California Proposition 65 Warning

Some products sold on this website may expose you to chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.

www.P65Warnings.ca.gov
🍳

Kitchen & Food Safety Advisory

Always follow manufacturer instructions for use, cleaning, and maximum temperature ratings. Do not use cookware or utensils that are cracked, chipped, or damaged.

Keep sharp kitchen tools out of reach of children. Use heat-resistant gloves when handling hot items.

🏠

Product Care & Usage Notice

Colors and finishes may vary slightly from product images due to screen settings and natural material differences. Follow care instructions to maintain product quality and longevity.

Not all products are suitable for outdoor use unless explicitly stated.

Secure payment
Guarantee safe checkout

Vesgantti Twin Mattress, 10 Inch Innerspring Hybrid Mattress In A Box, Pressure Relief Pocket Spring Twin Size Mattress With Mem

$189.85

Frequently Asked Questions

  • Q: What are the dimensions of the Vesgantti Twin Mattress? A: The Vesgantti Twin Mattress measures seventy-five inches long, thirty-nine inches wide, and ten inches high. This size is standard for twin mattresses, making it suitable for most bed frames.
  • Q: What materials are used in the Vesgantti Twin Mattress? A: The mattress is made of a combination of pocket spring coils and foam. This construction provides both support and comfort while ensuring good air circulation.
  • Q: Is this mattress CertiPUR-US certified? A: Yes, the Vesgantti Twin Mattress is CertiPUR-US certified. This means it meets rigorous standards for content, emissions, and durability, ensuring a healthier sleep environment.
  • Q: How should I set up the Vesgantti Twin Mattress? A: To set up the mattress, remove it from the box and allow it to fully expand for seventy-two hours. This ensures optimal comfort and support as it decompresses.
  • Q: Is the Vesgantti Twin Mattress suitable for all bed frames? A: Yes, this mattress fits most bed frame types, except adjustable bed frames. Its design is compatible with standard twin bed frames.
  • Q: How do I maintain the Vesgantti Twin Mattress? A: To maintain the mattress, use a mattress protector and clean it regularly with a damp cloth. Regular rotation every three to six months can help prolong its lifespan.
  • Q: Can I clean the Vesgantti Twin Mattress? A: Yes, you can clean the mattress surface with a damp cloth and mild detergent. Avoid using harsh chemicals or soaking it in water.
  • Q: What should I do if the mattress arrives damaged? A: If the mattress arrives damaged, please contact Vesgantti's customer support immediately. They can assist you with returns or exchanges based on their warranty policy.
  • Q: How does the motion isolation feature work? A: The mattress features individual pocket springs that work independently to absorb motion. This design reduces disturbances from movement, allowing for undisturbed sleep.
  • Q: Is the mattress safe for children? A: Yes, the Vesgantti Twin Mattress is safe for children. It contains no fiberglass or harmful chemicals, making it a healthy option for young sleepers.
  • Q: What is the weight capacity of the Vesgantti Twin Mattress? A: The mattress can support up to two hundred fifty pounds. This makes it suitable for most individuals while providing adequate support.
  • Q: How long does it take for the mattress to fully expand? A: The mattress takes approximately seventy-two hours to fully expand after unboxing. This ensures that it reaches its intended comfort level.
  • Q: Is the mattress breathable? A: Yes, the Vesgantti Twin Mattress is designed with breathable materials. This promotes airflow and helps maintain a comfortable sleeping temperature.
  • Q: Which firmness level does this mattress have? A: The mattress has a medium-firm feel. This level of firmness provides a balance of support and comfort, making it suitable for a variety of sleeping positions.
  • Q: Can I roll the mattress back after opening it? A: No, once the mattress is opened and expanded, it cannot be rolled back. Take care when unboxing to avoid any injuries.